City Engineering Office

Email: meobaliwag@gmail.com

Contact No: 0933-430-0239

Trunk Line: (044) 798-0391 Loc. 3647

Issuance Of Building Permit

MGA KINAKAILANGANG DOKUMENTO MGA DETALYADONG HAKBANG/PROSESO PANAHONG GUGUGULIN SA PAG PROSESO HALAGA O BAYAD SA PAG PROSESO KLIYENTE
1. Application Forms

  • Unified Application Forms and ancillary permit forms – 5 copies
  • Locational Clearance Form – 1 set

2. Transfer Certificate of Title  – 2 photocopies

If lot is not in the name of the applicant

  • Deed of Absolute Sale – 2 copies (notarized)

OR

  • Award Notice and/or Lease Contract – 2 copies  (notarized)

OR

  • Deed of Assignment or Donation (notarized)

For Corporation:

Corporate Secretary’s Certification authorizing the signatory

3. Tax Declaration of Real Property- 2 photocopies

4. Updated Official Receipt of Real Property Tax OR Certificate of Tac Clearance – 2 Copies

5. Barangay Building Clearance – 1 Photocopy

7. Building Plans at minimum scale 1:100 (signed by the owner, signed & sealed by professionals) – 5 sets

a. Geodetic Documents

b. Architectural Plans

c. Structural Plans

d. Sanitary/Plumbing Plans

e. Electrical Plans

f. Mechanical Plans

g. Fire Protection Plans

h. Electronics Plans

8. Cost Estimate/Bill of Material (signed by the owner, originally signed & sealed by professional, notarized) – 3 copies

9. Project Specifications (signed by the owner, originally signed & sealed by professionals) – 3 copies

10. Structural Analysis/Computation for 2-storey and above (Originally signed & sealed by professional each page) – 1 copy

11. Soil Boring Test for 3-storey and above (Originally signed & sealed by professional each page) – 1 copy

12. Valid PRC IDs  & current PTRs with dry seal and 3 spicemen signatures of all involved professionals – 3 copies

13. Softcopy of design plans on readable CD – 1 pc

1. SecureUnified Application Forms, ancillaryandaccessory permitforms&complywith requirements in the checklist. Application forms and checklist of requirements can also be downloaded from baliwag.gov.ph

 

2. Submit the complete documentary requirements fastened in a long white folder together with the blueprints inside a clear plastic expandable envelope.

 

3. Coordinate with the Inspection Team

 

4. Pay building permit, Fire Safety Clearance and Zoning permit fees at Baliwag Business Center (One-stop-shop)

 

5. Received approved Building Permit, Fire Safety Evaluation Clearance, Zoning Permit and the approved plan

  • 3 minutes

 

 

 

  • 3 minutes

 

 

  • 2 hours (Depend on location)

 

  • 10 minutes

 

  • 2 minutes
None General Public, Firm or Corporations, Agencies or  Instrumentalities of the Government

Issuance Of Occupancy Permit

MGA KINAKAILANGANG DOKUMENTO MGA DETALYADONG HAKBANG/PROSESO PANAHONG GUGUGULIN SA PAG PROSESO HALAGA O BAYAD SA PAG PROSESO KLIYENTE
1. Application Forms

  • Unified Application Form for Certificate of Occupancy and FSIC
  • Certificate of Completion Form (singed by the owner, signed and sealed by Architect/Civil Engineer In-charge of construction) (NOTARIZED) – 3 copies

2. Legal Documents

  • For Corporation
    • Corporate Secretary’s Certification authorizing the signatory (Notarized Original) 1- copy
    • Authorization letter and copy of government issued ID (if not the owner)

3. Approved building plans – 2 sets white print

OR

As-built Plans (signed by the owner, signed & sealed by professionals)  – 3 sets

4. Valid PRC IDs & current PTRs with dry seal and 3 specimen signatures of all involved professionals – 2 copies

5. Construction Logbook

1. Secure Unified Application Forms and Certificate of Completion from Baliwag Business Center (One-stop-shop) & comply with the requirements in the checklist. Application forms and checklist of requirements can also be downloaded from baliwag.gov.ph

2.Submit the complete documentary requirements fastened in a long white folder together with the blueprints inside a clear plastic expandable envelope.

3. Coordinate with the Inspection Team

4. Pay Occupancy Permit and Fire Safety Inspection Certificate fees at Baliwag Business Center (One-stop-shop)

5. Received Certificate of Occupancy, Fire Safety Inspection Certificate and approved plans(if applicable)

  • 3 minutes

 

 

  • 5 minutes

 

 

  • 2 hours (Depend on location)

 

  • 10 minutes

 

  • 2 minutes
None General Public, Firm or Corporations, Agencies or  Instrumentalities of the Government

Issuance Of Certificate Of Electrical Inspection

MGA KINAKAILANGANG DOKUMENTO MGA DETALYADONG HAKBANG/PROSESO PANAHONG GUGUGULIN SA PAG PROSESO HALAGA O BAYAD SA PAG PROSESO KLIYENTE
  • Application Forms
  • Duly accomplished Information sheet and Inspection Report Form – 1 copy
  • Electrical Permit Form (for electrical upgrade) signed and sealed by professionals – 5 copies
  • Yellow Card from Local Utility Company (MERALCO)
  • Electrical Plan (for electrical upgrade) originally signed and sealed by professionals – 2 sets
1. SecureElectrical Permit Form and Information Sheet and Inspection Report Formfrom Baliwag Business Center (One-stop-shop)&Yellow Card from MERALCO. Application forms and checklist of requirements can also be downloaded from baliwag.gov.ph

2.Submit Yellow Card and duly accomplished application forms together with the supporting documents

3. Coordinate with the Inspection Team

4. Pay electrical permit fees at Baliwag Business Center (One-stop-shop)

5. Received approved Electrical Permit, Certificate of Electrical Inspection and approved plans(if applicable) from Baliwag Business Center

  • 3 minutes

 

  • 3 minutes

 

  • 2 hours (Depend on location)

 

  • 5 minutes

 

  • 2 minutes
None General Public, Firm or Corporations, Agencies or  Instrumentalities of the Government